Latest News

July 20th, 2010

There has been a drop in the number of houses being built in the US during the month of June. According to Commerce Department figures, US home construction [...] > Read Full Article

November 17th, 2009

According to a recent report, over 60% of all industry professionals believe that 2010 will be a more positive year that 2009.
The survey, conducted [...] > Read Full Article

November 6th, 2009

Two of our piling operatives, Robert Clegg and Lewis Woodruff appeared in the Channel 4 Documentary featuring traditional Public Houses and more [...] > Read Full Article

November 4th, 2009

According to a recent report by the CIPS/Markit index, the pace at which purchasing spend has fallen in the construction industry, has speeded up [...] > Read Full Article

October 8th, 2009

We are pleased to be able to offer a fully comprehensive setting out package for builders/developers, house owners and self-build projects, which require [...] > Read Full Article

read all


 

Current Vacancies

We are currently recruiting for people with experience in the following ares

Piling Rig Operators with experience in Banut 400,500 and 700  machines ( 5 rigs )

On-Going contracts in Lagos  Nigeria

8 weeks on 2 weeks off  Permenant Contracts

contact harvey@mkpiling.com for more information or forward CV.  

Piling Case Studies - MK Piling Clients - Specialist Piling Studies

New Housing Development at Barnsley

New Housing Development at Barnsley
Hillstone Developments
Recently we have installed the specialist foundations for a new housing development at Barnsley.

View Case Study

Top driven steel piles

Top driven steel piles
Kindergarten extension to Bury Grammar School
During the last three months of 2006 we installed the piles, ground beams and floor slab to a new kindergarten extension at Bury Grammar School, Bury.

View Case Study

CFA Piles

CFA Piles
Wharf Rd, Whaley Bridge, Derbyshire
In early December we were asked to install 57no. 450mm diameter CFA piles on a site at Wharf Rd, Whaley Bridge, Derbyshire for a proposed development of flats and maisonettes.

View Case Study

Access problems with drilled piles

Access problems with drilled piles
Diggle, Saddleworth
In November 2006 we installed 14no. 165mm steel cased piles to an extension at the rear of a property in Diggle, Saddleworth near Oldham.

View Case Study

Bottom Driven Piles

Bottom Driven Piles
Port Vale Football Cub
At the beginning of December 2005 we were asked to install 10no. 220mm driven steel cased piles at Port Vale FC, Stoke-on-Trent. The piles were installed to provide a base for a new lighting tower.

View Case Study

6 to 10 of 13
< Previous /  Next >

Subscribe

Subscribe

 

Subscribe to our Mailing List